Turret Mooring Installation 2

Project

FPSO Espirito Santo (BC10 field offshore Brazil)

Functionality

Riser pull-in; Anchor chain pull-in; Umbilical pull-in

Technical specifications

Nominal line pull

335mT 

Maximum line pull

370mT 

Holding force

445mT 

Non-spin steel wire rope

320m

OD for chain pull-in

94mm

OD for riser pull-in

102mm

 

Two-compartment drum

 